根(gen)據《國務院(yuan)(yuan)關于修改〈建(jian)設(she)項(xiang)目竣(jun)(jun)工(gong)(gong)環(huan)境(jing)(jing)保護管理條例〉的決定》(國務院(yuan)(yuan)令第682號),以(yi)及(ji)環(huan)保部《關于發布(建(jian)設(she)項(xiang)目竣(jun)(jun)工(gong)(gong)環(huan)境(jing)(jing)保護驗收暫行辦法)的公(gong)(gong)告》(國環(huan)規(gui)環(huan)評(ping)[2017]4號),現將G215馬(ma)鬃山口岸至馬(ma)鬃山鎮公(gong)(gong)路工(gong)(gong)程竣(jun)(jun)工(gong)(gong)時(shi)間公(gong)(gong)示如下:
項目名稱:G215馬鬃山口岸至(zhi)馬鬃山鎮公路(lu)工程
建設單位:酒泉市(shi)交通運輸局
建設(she)地址:酒(jiu)泉市(shi)肅北縣馬鬃山鎮
建(jian)設(she)內(nei)容(rong):G215馬(ma)鬃(zong)山(shan)(shan)口(kou)(kou)岸至(zhi)馬(ma)鬃(zong)山(shan)(shan)鎮(zhen)公(gong)路(lu)(lu)(lu)工(gong)程(cheng)(cheng)起(qi)點位(wei)于(yu)馬(ma)鬃(zong)山(shan)(shan)口(kou)(kou)岸,由北向南沿原口(kou)(kou)岸道路(lu)(lu)(lu)走廊布設(she)至(zhi)紅石山(shan)(shan),經狼(lang)娃山(shan)(shan)、躍進山(shan)(shan)低山(shan)(shan)峽谷后,在馬(ma)鬃(zong)山(shan)(shan)鎮(zhen)北約4Km處接京新國家高速(su)(su)公(gong)路(lu)(lu)(lu)(G7)馬(ma)鬃(zong)山(shan)(shan)互(hu)通式立交。項目路(lu)(lu)(lu)線(xian)全長(chang)170.081Km,主(zhu)線(xian)為(wei)馬(ma)鬃(zong)山(shan)(shan)口(kou)(kou)岸至(zhi)馬(ma)鬃(zong)山(shan)(shan)鎮(zhen)按二級公(gong)路(lu)(lu)(lu)技(ji)術等級建(jian)設(she),長(chang)108.527Km,設(she)計(ji)(ji)時速(su)(su)80Km/h,其路(lu)(lu)(lu)基寬(kuan)度12m,行(xing)車道寬(kuan)度為(wei)2×3.75m,硬路(lu)(lu)(lu)肩(jian)寬(kuan)度為(wei)2×1.5m,土(tu)路(lu)(lu)(lu)肩(jian)寬(kuan)度為(wei)2×0.75m;項目全線(xian)共(gong)設(she)4條支(zhi)線(xian)(共(gong)計(ji)(ji)65.45Km)。分別(bie)是(shi)支(zhi)線(xian)一1.9Km;支(zhi)線(xian)二, 43.611Km;支(zhi)線(xian)三2.0Km;支(zhi)線(xian)四14.043Km,支(zhi)線(xian)一采用(yong)設(she)計(ji)(ji)速(su)(su)度40km/h的三級公(gong)路(lu)(lu)(lu)技(ji)術指標(biao),路(lu)(lu)(lu)基寬(kuan)8.5m,支(zhi)線(xian)二、三、四采用(yong)設(she)計(ji)(ji)速(su)(su)度20Km/h的四級公(gong)路(lu)(lu)(lu)標(biao)準,路(lu)(lu)(lu)基寬(kuan)度采用(yong)6.5m。項目主(zhu)線(xian)共(gong)設(she)置橋(qiao)梁1311.01m/22座,其中大橋(qiao)358m/3座,中橋(qiao)767.36m/12座,小橋(qiao)185.65m/7座;涵洞229道。本工(gong)程(cheng)(cheng)截止目前,實際完成總投(tou)資(zi)87251.90萬元,環(huan)保投(tou)資(zi)為(wei)424萬元,占工(gong)程(cheng)(cheng)總投(tou)資(zi)的0.48%。
竣(jun)工(gong)(gong)時間(jian):G215馬(ma)(ma)鬃山口岸至馬(ma)(ma)鬃山鎮公路工(gong)(gong)程于2017年7月(yue)(yue)開工(gong)(gong),2019年12月(yue)(yue)完成(cheng)交工(gong)(gong)驗收,項(xiang)目(mu)從建設至竣(jun)工(gong)(gong)期間(jian)未收到針對本項(xiang)目(mu)的(de)環(huan)境投訴(su)、也(ye)未受(shou)過環(huan)境保(bao)護(hu)部門的(de)處罰等,符合國家和地(di)方相關政策及法律法規(gui),建設過程中嚴格(ge)執行環(huan)保(bao)制度!
公(gong)示內容:竣工環保驗收調查報告(gao)及驗收意(yi)見
公示(shi)時間:2020年(nian)11月9號(hao)至(zhi)2020年(nian)12月4號(hao)(20個工作日(ri))